SI no. |
Name of the Work |
Location |
Completed in Year |
1 |
Construction Of Raised GDT Platform. |
INS, Parandu, Ramnad,(Tamil Nadu) |
2014 |
2 |
Provision Of Vehicle Parking Shed. |
INS, Kattabomman, Tirunelvelli, (Tamilnadu) |
2015 |
3 |
Provision Of Newn Room (11 X) Including Ac & False Ceiling. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
4 |
Provision Of Shed For Storage Space Between Hangers & Prov Of Hard Standing. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
5 |
Repairs To Runway. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
6 |
Provision Of Approach Road & Fencing With Concertina Coil. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
7 |
Special Repairs To Unservicable Ups Battery ,Parundu. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
8 |
Provision Of Childeren Park At Icgs Mandapam, Recarpeting & Raising Level Road Between Battery Workshop & Dispersal Area. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
9 |
Installation And Commissioning Of New NDB A & Provision Of Independent Lt Feeder Piller Box. |
INS, Parandu, Ramnad, (Tamil Nadu) |
2015 |
10 |
Provision Of Cctv Cameras. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2015 |
11 |
Supply & Fixing Of Acoustical Furniture Board. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2014 |
12 |
Job Order For Hiring ,Manning & Operation Services For 1 X 320 Kva Diesel Generator. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2015 |
13 |
Special Repairs To Sea Water Sumps,Walls,Joinery,Flooring,Roofing,Drainage,Wiring,Fittings & Fixture In Bldg No 35. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2016 |
14 |
Hiring Of Potable Water For Project Site. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2017 |
15 |
As & As To Road From Main Gate To Ge Office |
INS Kalinga, Visakhapatnam |
2016 |
16 |
Repairs/Resurfacing Of Road From Chalukya Gate To Fllet Junction And Aproach Road To Fire Brigade Including Road Marking Paint Androad Furniture To Southavenue Roads. |
Visakhapatnam |
2016 |
17 |
Urgent Repair Works At Vsat Station. |
Dolphin Hills,Visakhapatnam |
2016 |
18 |
Provide All Material For Full & Entire Completion Of The Work & Services Required For Execution Of Work. |
INS Kalinga, Visakhapatnam |
2016 |
19 |
Special Repairs To Roof Treatment Of C Sector At Dolphin Hill Renewal Of Old Perisihed Wooden Windows And Doors Of 1 St Floor And 2 Nd Floor In New Fmu Complex INSide Naval Dockyard Provision Of Foot Path Around Play Fields At Fleet Sports Complex. |
INS Dolphin,Visakhapatnam |
2016 |
20 |
Repair To Certain Aluminum And Wooden Joinery Flooring Rolling Shutter Of Generator Room And Miscellaneous Work. |
Naval Dockyard,Visakhapatnam |
2017 |
21 |
As & As To Existing Boundary/Security Wall At Svn Colony 104 Area. |
INS,Visakhapatnam |
2017 |
22 |
Provision Of Perimeter Path Way Around Boundary Wall Along With Approach Path Of Df Antennae At 1n Det. |
INS, Visakhapatnam |
2017 |
23 |
As & As To Single Living Junior Sailors Accn Building (P-31) And Single Living Dsc Accn Building (P-42). |
INS Kalinga,Visakhapatnam |
2017 |
24 |
Aoditiional Rerair5 Worxs At Vsat At Station. |
INS Dolphin,Visakhapatnam |
2017 |
25 |
Carrying Civil Works At Wp-03 Project Varsha. |
NAOB Visakhapatnam |
2017 |
26 |
Provision of Road And Allied Services . |
NAOB Visakhapatnam |
2018 |
27 |
Carrying Out Works At Ssv-T. |
Rambilli |
2018 |
28 |
Provision Of Security Fencing At NAOB (V). |
Rambilli, Visakhapatnam |
2019 |
29 |
Provision Of Vehicle Repair Shed (P-84). |
Ctw INS, Visakhapatnam |
2019 |
30 |
Provision Of Precast Cover Slab Over Existing Storm Water Drain With Manholes. |
INS Rambilli, Visakhapatnam |
2019 |
31 |
Procurement Of Erection Op Pre-Fabricated Shelters (Design And Constructionj For NAOB (Rbi). |
INS Rambilli, Visakhapatnam |
2019 |
32 |
Construction Of Road And Allied Services. |
Naval Base Visakhapatnam |
2018 |
33 |
Construction Of Security Fencing Work. |
Naval Base Visakhapatnam |
2022 |
34 |
Construction Of Vehicle Repair Shed. |
Naval Base Visakhapatnam |
2019 |
35 |
Precast Cover Slab Over Existing Storm Water Drain With Manholes. |
Rambilli Visakhapatnam |
2019 |
36 |
Erection Op Pre-Fabricated Shelters (Design And Construction For NAOB). |
Rambilli, Visakhapatnam |
2019 |
37 |
Repair / Maintenance Of Lt Bus Trunking Junction Boxes. |
Naval Dockyard, Visakhapatnam |
2020 |
38 |
Rerouting & Provision Of Cable And Panels Between Matshya And Surya Dock For Pbs,Capstans And De-Humidifiers. |
Naval Dockyard, Visakhapatnam |
2020 |
39 |
Demolition/Reconstruction Of Dockyard Apprentices Hostel Building. |
Visakhapatnam |
2022 |
40 |
Repair / Replacement Of Duct Covers, Structural Steel And Painting Works Of Jetty. |
Naval Dockyard, Visakhapatnam |
2021 |
41 |
Repair / Replacement Of Lt Voltage Stabilizer Metering Equipments Switch Gears And Allied Works. |
Naval Dockyard, Visakhapatnam. |
2021 |
42 |
Construction Of Gas Cylinder Store. |
MO Visakhapatnam |
2022 |
43 |
Hiring Of Outsourcing Je & AE's. |
DGNP, Visakhapatnam (Andhra Pradesh) |
2023 |
44 |
Construction Of Project Office. |
Rambilli Visakhapatnam |
2023 |
45 |
Construction Of Ware House Building. |
Naval Dockyard, Visakhapatnam |
2024 |
46 |
Construction Of Load Test Bay And Stealth Material Workshop. |
Naval Dockyard, Visakhapatnam |
2022 |
47 |
Construction Of 150 Mtrs Section Jetty Along N33 Coastguard Jetty. |
Naval Dockyard, Visakhapatnam |
2022 |
48 |
PROVISION OF MAIN ROAD AND ALLIED SERVICES UNDER WP-04B. |
Navalstation, Rambilli, Visakhapatnam. |
Completed |